Full & Partial Electrical Rewiring

Professional Electrical Rewiring Across London for Homes, Landlords & Businesses

Replace ageing, damaged or unsuitable wiring with a carefully planned electrical rewiring service built around your property. Benjamin Services assesses the existing installation, renews outdated cables and circuits, upgrades sockets, switches and protective devices where required, then tests the completed work and provides the appropriate certification with a clear handover when the rewiring is finished.

Book a Survey
Why Rewiring Matters FAQs
⚡ Full & Partial Electrical Rewiring Across London

Safer Wiring, Planned Around the Way You Use Your Property

Rewiring is not simply a matter of replacing old cable. It is a chance to build a safer, better-organised electrical installation around the way the property is used today. Benjamin Services assesses the existing wiring, discusses your socket, lighting and equipment requirements, then plans either a full rewire or a carefully defined partial rewire. New circuits are installed, tested and documented in line with the current BS 7671 requirements, with the appropriate certification and Building Regulations notification provided when the work is complete.

Full and partial rewiring options First fix, second fix and coordinated project planning Testing, EIC and Part P notification where applicable
Your rewire at a glance
Assessment Existing wiring, earthing, circuits, access and property condition
Design Socket, lighting, appliance and future-load requirements agreed clearly
Handover Testing, EIC, circuit schedule and Part P records where required

A rewire normally requires access beneath floors and inside walls or ceilings. Plastering, decoration and other making-good work are included only when they are clearly listed in your quotation.

01 The Service

What Does Electrical Rewiring Involve?

Rewiring replaces unsuitable or deteriorated wiring and reorganises the installation into properly designed circuits. The exact scope depends on the condition of the property and what the new electrical system needs to support.

  • Old or unsuitable cables are safely disconnected
  • New power, lighting and fixed-equipment circuits are installed
  • Sockets, switches and connection points are positioned to the agreed design
  • Protective devices, earthing and bonding are reviewed as part of the work
02 Common Reasons

When Should Rewiring Be Considered?

  • An inspection identifies damaged, unsafe or unsuitable wiring
  • Old rubber, fabric or lead-covered cable is still present
  • Sockets show heat damage, buzzing or repeated electrical faults
  • The existing installation cannot support planned renovation or new loads
  • Years of alterations have left circuits poorly arranged or difficult to verify
03 What You Receive

A Planned Installation with a Clear Handover

  • An agreed electrical layout and defined scope of work
  • New circuits installed for the property’s current requirements
  • Clearly identified protective devices and circuit schedules
  • An Electrical Installation Certificate with recorded test results
  • Building Regulations notification where the work is notifiable
Survey, testing and practical planning

What We Review Before Recommending a Rewire

The age of a property alone does not confirm that it needs rewiring. We look at the condition of the installation, how it has been altered, what the building now requires and how the new cables can be installed with disruption kept as controlled as possible.

01

Existing Wiring Condition

Cable type, insulation condition, joints, accessories and previous alterations are reviewed.

02

Consumer Unit & Protection

The existing board, circuit protection, surge protection and available capacity are considered.

03

Earthing & Bonding

Main earthing, protective conductors and bonding arrangements are checked against the proposed design.

04

Electrical Layout

Socket, lighting, appliance, alarm, data and future equipment requirements are discussed room by room.

05

Cable Routes & Access

Floor construction, ceiling voids, wall finishes, loft access and likely cable routes affect the programme.

06

Property Use & Future Demand

Extensions, electric heating, EV charging, kitchens, home offices and landlord requirements are considered early.

The scope should follow the evidence

Does the Property Need a Full Rewire or a Partial Rewire?

Not every older property needs every cable replaced, and a new-looking consumer unit does not prove that the hidden wiring is suitable. We use inspection, testing and the planned use of the building to define the right scope, then explain what will remain, what will be renewed and how the two will work together.

FULL

Full Electrical Rewire

The main power, lighting and fixed-equipment circuits are renewed throughout the agreed property, usually as part of a major upgrade or renovation.

PART

Partial Rewire

Selected circuits or areas are replaced where the remaining installation can be retained safely and the boundary of the new work can be clearly tested.

PLAN

Renovation & Extension Wiring

New wiring is coordinated with kitchens, bathrooms, lofts, extensions and refurbishment work so first fix happens before surfaces are closed.

The final recommendation depends on the installation found on site. Where further investigation is needed, we explain that before fixing the scope or price.

Clear service boundaries

What Is Not Automatically Included in a Rewire?

Your quotation lists the electrical work and materials included in the agreed scope. Building, decorating and specialist work remain separate unless they are specifically shown in the proposal.

  • Plastering, painting, wallpapering or full decorative making good
  • Asbestos surveys, sampling or removal by a licensed specialist
  • Removal and refitting of fitted furniture, kitchens or specialist flooring
  • Premium light fittings, smart-home, data, CCTV or audio systems unless agreed
  • Meter, service head or network equipment owned by the supplier or DNO
  • Temporary accommodation, storage, cleaning or moving services
What to expect

A Carefully Planned Four-Stage Rewiring Process

Rewiring is intrusive work, so planning matters. We agree the layout, sequence and access before work begins, then keep you informed if the building reveals something that could affect the programme or price.

  1. 01

    Survey & Electrical Design

    We assess the installation, agree outlet positions, define circuits and confirm the written scope.

  2. 02

    Safe Isolation & First Fix

    Old wiring is disconnected as agreed, routes are opened and new cables and back boxes are installed.

  3. 03

    Second Fix & Connections

    Sockets, switches, accessories, protective devices and agreed equipment are fitted and connected.

  4. 04

    Test, Certify & Handover

    The completed installation is inspected, tested, labelled and handed over with the required records.

Before work begins

How to Prepare the Property for Rewiring

Good preparation protects your belongings and gives the electricians safer access to each working area.

  • Confirm final socket, switch, lighting and equipment positions
  • Clear furniture and stored items from the agreed working rooms
  • Protect or remove fragile, valuable and dust-sensitive belongings
  • Provide access to floors, lofts, cupboards, risers and the consumer unit
  • Plan for periods without power and discuss any essential equipment
  • Coordinate plasterers, decorators, kitchen fitters and other trades around first fix
Evidence behind the completed installation

Inspection, Testing, Certification and Building Regulations Records

A rewire is not complete when the last socket is fitted. Each new circuit must be inspected and tested, the protective devices must be verified and the results must be recorded. These documents form an important part of the final handover for homeowners, landlords, buyers and future electricians.

EIC

Electrical Installation Certificate

Records the design, construction, inspection and testing of the new installation work.

TEST

Schedule of Test Results

Documents the measured results and protective-device details for the completed circuits.

P

Part P Notification

Domestic rewiring is notified under Building Regulations where the work is notifiable.

MAP

Labels & Circuit Schedule

The consumer unit and circuits are labelled to support safe operation and future maintenance.

When the building changes the plan

What Happens if the Agreed Rewiring Scope Needs to Change?

Some conditions remain hidden until floors are lifted or walls are opened. If we find an unsafe route, damaged structure, inaccessible area or supply issue that affects the agreed work, we stop at the appropriate point, explain the finding and agree the next step before continuing.

01

Record the Finding

We identify the issue and show how it affects the original design or cable route.

SAFE

Keep the Area Safe

Work is paused or isolated where continuing would create unnecessary risk.

INFO

Explain the Options

Alternative routes, repairs or specialist input are discussed in plain English.

£

Confirm Any Variation

Extra labour or materials are priced and agreed before additional work begins.

PLAN

Update the Programme

We revise the sequence where plastering, access or another trade needs to change.

Test and Document

The completed solution is tested and reflected in the final certification.

Transparent London planning ranges

How Electrical Rewiring Prices Are Calculated

Rewiring prices depend on much more than bedroom count. The final cost is shaped by the number of circuits and outlets, access beneath floors and inside walls, whether the property is occupied, the fittings selected, the condition of the supply and how much making good is included. These figures are planning guides rather than automatic fixed prices.

Partial Rewire
Surveyed and definedTailored Quote
Selected rooms, circuits or renovation areas
  • Scope based on inspection and test findings
  • Clear boundary between retained and renewed wiring
  • Testing and certification for the completed work
Request a Partial-Rewire Survey
Two to Three Bedrooms
Typical planning range£4,000–£8,000
Range varies with size and specification
  • Room-by-room layout and circuit planning
  • First fix, second fix, testing and handover
  • Price adjusted for occupancy and making good
Request a Home-Rewire Quote
Larger or Complex Property
Typical planning range£8,000–£11,000+
Four bedrooms, HMOs or complex access
  • More circuits, accessories and distribution equipment
  • Managed phasing for occupied or renovated properties
  • Tailored design for specialist or higher electrical demand
Discuss a Larger Rewire
Landlords, HMOs, Renovations and Commercial Properties Larger projects are planned around occupancy, shutdowns, fire-alarm and emergency-lighting interfaces, access, operating hours, other trades and the documentation required for the building. Request a Tailored Survey
Normally included Agreed wiring, standard accessories, installation, testing, EIC and notification where applicable.
Main price factors Property size, point count, cable routes, occupancy, fittings, access and project phasing.
Quoted separately Decoration, plastering, premium fittings, asbestos work, DNO work and specialist systems.
VAT & travel Benjamin Services is not currently VAT registered. Parking or exceptional travel costs are confirmed separately.

Guide prices assume reasonable access and a conventional domestic installation. The written quotation is confirmed after reviewing the property, proposed outlet schedule, cable routes, consumer unit, finish specification and any required making-good work.

Electrical Rewiring across London

Clear Design. Controlled Installation. Proper Certification.

Send us the postcode, property type, number of bedrooms, renovation plans and any existing electrical reports. We will use those details to recommend the right survey and quotation route for a full or partial rewire.

Why Electrical Rewiring Matters

Why Renewing Old or Unsuitable Wiring Can Protect the Whole Property

Rewiring gives you more than new cables behind the walls. It replaces unsafe or unreliable parts of the installation, improves the way circuits are organised and creates an electrical system that better suits how the property is used today.

Do not wait for a complete power failure: repeated tripping, crackling sounds, a burning smell, scorch marks, unusual heat, damaged sockets or visible old wiring should be checked promptly. Avoid repeatedly resetting a circuit that will not remain on.

Condition before assumption Finding Out Whether the Property Really Needs Rewiring

An older property does not automatically need a full rewire, and a recently fitted consumer unit does not prove that the hidden cables are in good condition. The recommendation should come from inspection, testing and a clear understanding of the installation.

  • An EICR can reveal the real condition of the fixed wiring, protective devices, earthing arrangements and electrical accessories before major work is planned.
  • Cable type and visible warning signs matter more than the age of the building alone. Rubber, fabric or lead-covered wiring may need closer investigation.
  • The scope can be full or partial where testing shows that some circuits can be retained safely and the boundary of the new work can be clearly verified.
Shock, heat and fire risk Replacing Wiring That Has Become Unsafe or Unreliable

Cable insulation can deteriorate, connections can loosen and years of alterations can leave circuits difficult to understand or protect. A properly planned rewire removes agreed unsafe wiring and rebuilds the installation around clearly designed circuits.

  • Damaged insulation and poor connections can increase the risk of electric shock, overheating and electrical fire if they are left unresolved.
  • New earthing, bonding and protective arrangements are considered as part of the design rather than treated as an afterthought at the end of the project.
  • Every completed circuit is inspected and tested before it is placed into service, helping confirm that the finished installation performs as intended.
Practical use and future demand Wiring Designed Around Modern Rooms, Equipment and Renovation Plans

Many older installations were designed for far fewer appliances, sockets and fixed electrical loads. Rewiring lets the layout be planned room by room, so the finished property is safer and easier to use without depending on extension leads or improvised additions.

  • Socket and switch positions can be planned properly around furniture, kitchens, home offices, appliances and the everyday movement of people through the property.
  • Dedicated circuits can support higher-demand equipment such as cooking appliances, electric heating, EV chargers, workshops or other agreed fixed loads.
  • Rewiring can be coordinated with renovation work so first fix happens before walls, floors and ceilings are closed, reducing avoidable disruption later.
Testing, certification and records A Tested Installation with the Documents to Support It

A professional rewire should finish with more than working lights and sockets. The new installation must be inspected and tested, the results recorded and the required Building Regulations process completed for notifiable domestic work.

  • An Electrical Installation Certificate records responsibility for the design, construction, inspection and testing of the completed electrical work.
  • Schedules of inspections and test results document the new circuits, protective devices and measured values behind the final handover.
  • Part P notification is arranged where applicable for notifiable domestic rewiring work in England, giving the owner a Building Regulations compliance record.

Electrical rewiring, inspection and Building Regulations information is based on guidance from GOV.UK Approved Document P , NICEIC homeowner rewiring guidance , IET BS 7671 model certificates and Electrical Safety First .

Professional Full & Partial Rewiring

Full & Partial Electrical Rewiring Across London

Benjamin Services delivers carefully planned full and partial rewiring for homes, landlords, managing agents and businesses across London. We assess the existing installation, agree the new electrical layout, install and connect the required circuits, then test the completed work and provide the appropriate certification at handover.

Survey, Testing & Rewiring Scope

We assess the existing wiring, consumer unit, earthing, bonding, circuit condition, access and the property’s future needs.

Full or Partial Rewire Planning

The scope is based on inspection and testing, with a clear plan for the circuits that will be renewed and any wiring that can remain.

First Fix, Second Fix & Coordination

Cable routes, back boxes, sockets, switches and fixed equipment are installed in stages and coordinated with the wider renovation programme.

Testing, EIC & Part P Records

Completed circuits are inspected and tested, with the appropriate Electrical Installation Certificate and Part P notification provided.

Benjamin Services Electrical Rewiring Guidance

Electrical Rewiring Questions, Answered Clearly

Clear answers about full and partial rewiring, EICRs, disruption, first and second fix, Part P notification, certification and electrical rewiring prices across London.

The rewiring scope should follow inspection, testing and the property's needs

Building age alone does not confirm that every cable needs replacing. Wiring condition, earthing, protective devices, previous alterations, access and future electrical demand should all be considered.

01 What does an electrical rewire involve?

An electrical rewire replaces unsuitable, damaged or deteriorated fixed wiring with newly designed circuits. Depending on the agreed scope, this may include power, lighting and fixed-equipment cables, sockets, switches, connection points, protective devices, earthing and bonding. The layout is planned around the way the property is used, then the completed installation is inspected, tested and documented.

02 How can I tell whether my property needs rewiring?

Warning signs can include old rubber, fabric or lead-covered cable, damaged sockets, scorch marks, crackling sounds, unusual heat, repeated faults or years of poorly documented alterations. These signs need professional investigation, but they do not confirm the final scope on their own. Inspection and testing, often through an EICR, help establish whether repair, partial rewiring or a full rewire is appropriate.

03 Does an older property automatically need a full rewire?

No. The age of the building alone does not prove that the wiring is unsafe. Cable type, condition, previous alterations, earthing, protective devices and test results all matter. Some older installations remain serviceable, while newer wiring can still be damaged or poorly installed. The recommendation should follow evidence from inspection and testing rather than a simple age-based rule.

04 What is the difference between a full rewire and a partial rewire?

A full rewire renews the main agreed power, lighting and fixed-equipment circuits throughout the property. A partial rewire replaces selected circuits or areas, such as a kitchen, extension or damaged section, while suitable existing wiring remains in service. Partial work needs a clearly defined boundary so the retained and new parts can be assessed, connected and tested properly.

05 Should I arrange an EICR before deciding on a rewire?

An EICR can be useful when the condition of the existing installation is uncertain. It records observations and test results that may show whether circuits need repair, further investigation or replacement. For a major renovation, a dedicated rewiring survey may also be needed to plan socket positions, lighting, equipment loads, cable routes and access. The right starting point depends on the property and the work being considered.

06 How disruptive is electrical rewiring?

Rewiring is usually intrusive because new cables often need routes beneath floors, above ceilings and inside walls. Floorboards may need lifting and channels may be cut where concealed wiring is required. Careful planning can reduce unnecessary disruption, especially when the work is coordinated with renovation. Plastering, decoration and full making good are included only when they are clearly listed in the quotation.

07 How long does a house rewire take?

The programme depends on the property size, number of circuits and accessories, access, occupancy, finish specification and coordination with other trades. A smaller empty flat may take several working days, while a larger house or phased occupied project can take considerably longer. The expected first-fix, second-fix, testing and handover stages are discussed after the survey and electrical layout have been agreed.

08 Can I stay in the property while it is being rewired?

Sometimes, but it is not always practical or comfortable. Rewiring creates dust, noise, open working areas and periods without normal power. Empty properties are usually easier to rewire safely and efficiently. Where the building must remain occupied, the work may need careful phasing, temporary supplies and protected areas. Essential equipment, tenants, children, pets and accessibility needs should be discussed before the programme is agreed.

09 Are the consumer unit, sockets and switches included in a rewire?

They can be, but the exact inclusions must be confirmed in the written quotation. A full rewire commonly includes a suitable consumer unit or protective-device arrangement, agreed standard sockets and switches, new circuit cabling, testing and certification. Decorative fittings, smart controls, data cabling, alarms, specialist equipment and premium accessories may be priced separately unless they are part of the agreed specification.

10 What are first fix and second fix in electrical rewiring?

First fix is the stage when cable routes, wiring, back boxes and other concealed parts are installed before walls, floors and ceilings are closed. Second fix takes place after the main building finishes are ready and includes fitting sockets, switches, light connections, protective devices and agreed equipment. Coordinating these stages with builders, plasterers, kitchen fitters and decorators helps prevent delays and repeated work.

11 Is a full electrical rewire notifiable under Part P in England?

Yes. A full rewire in a dwelling is notifiable electrical work under Part P of the Building Regulations in England. Notification can be handled through a registered competent person scheme or the appropriate building control route. The Building Regulations compliance record is separate from the Electrical Installation Certificate, which documents the design, construction, inspection and testing of the electrical installation.

12 What certificates and records should I receive after rewiring?

For a completed rewire, you should receive an Electrical Installation Certificate together with the relevant schedules of inspections and test results. Circuits and protective devices should also be clearly identified. Where domestic work is notifiable, the appropriate Building Regulations compliance record should be provided through the chosen notification route. Keep these documents with the property's electrical and renovation records.

13 How much does electrical rewiring cost in London?

The cost depends on property size, circuit and point count, cable routes, occupancy, access, selected accessories, consumer-unit requirements and the amount of making good included. Benjamin Services uses planning ranges of about £3,000–£4,800 for a one-bedroom flat, £4,000–£8,000 for many two- to three-bedroom properties and £8,000–£11,000 or more for larger or complex projects. Partial rewires are surveyed and quoted around the defined scope.

14 What information is needed for an electrical rewiring quote?

Send the postcode, property type, approximate floor area or bedroom count, occupancy status and details of any renovation work. A room-by-room idea of sockets, lighting, fixed appliances and future equipment is helpful. Include any EICR, electrical certificates, floor plans or photographs available, and mention restricted access, specialist finishes, essential equipment, HMOs, commercial use or work that must be phased around other trades.

Guidance follows information from GOV.UK Approved Document P , NICEIC homeowner rewiring guidance , Electrical Safety First rewiring guidance and IET BS 7671 model certificates .

Need an Electrical Rewiring Quote for Your Property?

Send the postcode, property type, bedroom count, occupancy status, renovation plans and any existing EICR or electrical certificates.