From early lease and consent reviews to drawings, structural information, method statements, contractor details and approval-condition coordination, Benjamin Services helps leaseholders, landlords, freeholders, developers and property managers prepare alteration proposals across London. We review the proposed work, lease restrictions, ownership responsibilities, structural changes, Party Wall interfaces, fire and services implications, insurance requirements, access arrangements and available property records, then help organise the information commonly needed for a Licence to Alter or other building alteration consent.

Book Assessment
Why Alteration Consent Matters FAQs
🏢 Practical Building Alteration Approval Support Across London

Review the Lease, Prepare the Technical Package and Secure Consent Before Work Starts

Alterations to flats, leasehold homes, managed blocks and commercial premises may require written consent from a landlord, freeholder, management company or superior landlord before construction begins. Benjamin Services helps leaseholders, landlords, freeholders, developers and property managers organise the information commonly needed for a Licence to Alter or other alteration approval. We review the proposed works, lease restrictions, ownership responsibilities, structural changes, Party Wall interfaces, fire and services implications, contractor details, insurance, access, protection measures and available approvals, while the relevant landlord or freeholder remains responsible for the final consent and conditions.

Lease terms, ownership structure, proposed work and likely consent route reviewed first Drawings, structural information, method statements, contractor and insurance details coordinated clearly Landlord queries, approval conditions, site evidence and close-out records supported without guaranteeing consent
Your alteration approval support at a glance
Review Check the lease, freeholder requirements, proposed works, affected areas and related approvals
Prepare Coordinate drawings, specifications, structural details, method statements and contractor records
Support Assist with submissions, queries, approval conditions, access arrangements and close-out documents

Pricing depends on the property, ownership structure, alteration type, lease complexity, technical information, specialist input, landlord requirements and level of follow-up required.

01 LEASE Lease & Consent Review

Check the Ownership Structure and Consent Requirements Before Design Work Is Finalised

The required route may involve a Licence to Alter, landlord consent, management-company approval, superior-landlord consent or several approvals together.

  • Lease clauses and alteration restrictions reviewed
  • Freeholder, landlord and managing-agent roles clarified
  • Demised areas, common parts and retained structure identified
  • Planning, Building Regulations and Party Wall matters separated
02 DOCS Technical & Contractor Package

Prepare Consistent Drawings, Structural Information and Construction Documents

A strong consent package usually needs more than a floor plan. The landlord may ask for technical details, contractor information and clear protection measures.

  • Existing and proposed drawings coordinated
  • Structural calculations and engineer details organised where needed
  • Method statements, programme and protection measures prepared
  • Contractor insurance, competence and contact details collated
03 COND Conditions & Close-Out

Track Approval Conditions, Access Rules, Inspections and Final Records

Consent may include conditions controlling working hours, access, protection, inspections, deposits, reinstatement and completion evidence.

  • Approval conditions and responsibilities recorded
  • Access, deliveries and common-area protection coordinated
  • Site changes and requested evidence tracked
  • Certificates, photographs and final records organised at completion
Different properties and alteration types need different approval routes

Building Alteration Approval Services We Can Help Coordinate

The right scope depends on the lease, freeholder, managing agent, property type, alteration complexity and documents already available. Support can cover an early lease review, Licence to Alter preparation, technical-document coordination, contractor approval, landlord queries, conditions or completion close-out.

01

Initial Lease & Consent Review

Lease clauses, ownership roles and likely approval route reviewed before work proceeds.

02

Licence to Alter Preparation

Application documents, drawings and required supporting information coordinated.

03

Structural Alteration Support

Engineer details, loadbearing changes and structural interfaces organised.

04

Contractor & Insurance Approval

Contractor credentials, policies, method statements and programme information collated.

05

Landlord Query & Condition Support

Further information, requested revisions and consent conditions tracked.

06

Completion & Close-Out Records

Certificates, as-built information, photographs and reinstatement evidence organised.

Common alteration approval workstreams

Key Areas That Often Need to Be Prepared Together

Requirements differ between landlords, freeholders and managing agents. The final package should be matched to the actual lease, building rules and requested scope.

Consent Route
Landlord Consent, Licence to Alter or Management Approval

The first decision before fees and documents are finalised

  • Lease and title structure reviewed
  • Consent authority and process identified
  • Application fees and deposits flagged
  • Separate statutory approvals noted
The landlord, freeholder or appointed surveyor determines the final consent route.
Drawings & Scope
Existing Plans, Proposed Works & Affected Areas

The alteration should be described clearly and consistently

  • Existing and proposed layouts coordinated
  • Walls, floors, ceilings and services identified
  • Common parts and retained structure considered
  • Materials and finishes described where relevant
Detailed construction design is separate unless expressly included.
Structure & Party Wall
Loadbearing Changes, Engineer Details & Neighbour Interfaces

Structural work often needs specialist evidence and separate notices

  • Loadbearing walls and structural openings identified
  • Engineer calculations and details coordinated
  • Party Wall implications flagged separately
  • Temporary works and sequencing considered
Structural engineering and Party Wall appointments remain separate unless listed.
Method & Programme
Method Statements, Working Hours, Access & Protection

The landlord needs to understand how the work will be carried out

  • Construction sequence and duration explained
  • Noise, dust and vibration controls noted
  • Deliveries, waste and access arrangements planned
  • Common-area protection and cleaning addressed
Site logistics should reflect the building's own rules and restrictions.
Contractor & Insurance
Competence, Policies, References & Responsibility

Contractor information helps the landlord assess project risk

  • Public liability and relevant insurance checked
  • Contractor details and experience recorded
  • Health and safety information organised
  • Emergency and site contacts confirmed
The contractor remains responsible for workmanship, safety and contractual duties.
Other Approvals
Planning, Building Regulations, Fire & Services

Landlord consent does not replace statutory approval

  • Planning permission needs separated
  • Building Regulations requirements identified
  • Fire and building-services implications flagged
  • Utility, estate or superior-landlord approvals considered
Each approval route has its own documents, fees and decision process.
The lease and proposed work matter. Send the full address, lease or alteration clauses, property type, proposed work, drawings, structural information, contractor details and any landlord or managing-agent correspondence so the likely approval scope can be reviewed before work starts.
A strong alteration application is built from consistent lease, technical and contractor information

Lease Restrictions, Drawings, Structure, Services, Site Logistics and Insurance Need to Agree

A proposed floor plan alone does not explain whether the alteration can proceed. The lease, ownership responsibilities, common parts, technical details, contractor arrangements and building rules all need to support the same proposal.

LEASE

Rights & Restrictions

Alteration clauses, demised areas and landlord powers shape the consent route.

TECH

Design & Structure

Drawings, calculations and service changes should be accurate and coordinated.

SITE

Contractor & Logistics

Insurance, access, protection and working arrangements should match building rules.

Important checks before an application is submitted

One Missing Document Can Delay the Wider Consent Process

Lease information, drawings, structural details, method statements, insurance and access arrangements should be reviewed together before submission.

Lease, Title & Ownership Responsibilities
Clarify What Is Demised, Retained and Controlled by the Landlord
LeaseAlteration covenants and consent wording reviewed
DemiseInterior, structure and service ownership clarified
PartiesLandlord, freeholder and managing agent identified
FeesSurveyor, legal and administration costs flagged

Legal interpretation of the lease may require a solicitor where the wording is uncertain.

Structural Changes & Building Fabric
Coordinate Openings, Floors, Ceilings, Waterproofing and Load Paths
WallsLoadbearing and non-loadbearing changes identified
FloorsPenetrations, strengthening and finishes considered
Wet AreasWaterproofing and leak-risk controls reviewed
EngineerCalculations and details tracked where required

Structural or waterproofing work may attract additional surveyor requirements.

Fire Safety, Services & Shared Systems
Review Changes Affecting Fire Protection, Drainage, Heating and Electrical Services
FireCompartmentation and penetrations considered
DrainageConnections and shared stacks reviewed
HeatingCommunal or landlord systems identified
ElectricalMetering, risers and certification needs considered

Work to communal or landlord-controlled systems normally needs explicit approval.

Contractor, Insurance & Health and Safety
Provide Clear Responsibility, Competence and Risk-Control Information
InsuranceRequired policy limits and dates checked
ContractorCompany, contacts and experience recorded
MethodSequence, tools and risk controls explained
SafetySite supervision and emergency details organised

The landlord may reject contractors or policies that do not meet building requirements.

Access, Protection & Completion Records
Plan Deliveries, Working Hours, Common-Area Protection and Close-Out
AccessKeys, lifts, loading and delivery routes planned
ProtectionFloors, walls, lifts and common parts covered
HoursPermitted working times and noise rules noted
Close-OutCertificates, photos and reinstatement evidence organised

Deposits or retention sums may depend on satisfactory protection and close-out evidence.

Legal advice, lease interpretation, structural engineering, Party Wall services, fire-engineering reports, planning applications, Building Regulations drawings, asbestos surveys and landlord-appointed surveyor fees may require separate appointments or quotations.

Clear Building Alteration Approval boundaries

What Is Not Automatically Included in an Alteration Approval Quote?

The quotation covers the listed review, preparation, technical coordination and agreed follow-up. Landlord fees, legal work, specialist services and construction remain separate unless specifically included.

  • Landlord, freeholder, managing-agent, legal or surveyor fees
  • Guarantee of consent, Licence to Alter issue or acceptance of a contractor
  • Lease interpretation, legal advice, disputes or tribunal representation
  • Structural engineering, Party Wall or specialist reports unless listed
  • Planning, Building Regulations or fire approvals unless expressly included
  • Construction management, workmanship supervision or unlimited design revisions
From the first lease review to an organised consent package

A Four-Stage Building Alteration Approval Process

The exact sequence depends on the lease and building, but the work should move through consent review, document preparation, formal submission and condition or close-out support.

  1. 01

    Review the Lease & Approval Route

    We review the property, proposed works, lease information and likely consent requirements.

  2. 02

    Prepare the Technical Package

    Drawings, structural details, method statements and contractor records are coordinated.

  3. 03

    Submit & Answer Queries

    Application information and further landlord or surveyor requests are tracked.

  4. 04

    Manage Conditions & Close-Out

    Approval conditions, access, inspections and completion evidence are organised within scope.

Before the assessment

Information That Helps Us Review the Alteration

Lease, technical and contractor information makes the first review more useful.

  • Send the full address, property type and ownership or leasehold details
  • Share the lease, alteration clauses and any building handbook or estate rules
  • Describe the proposed work and provide drawings, photos and structural information
  • Send landlord, freeholder or managing-agent correspondence already received
  • Provide contractor details, insurance, method statement and proposed programme
  • Confirm planning, Building Regulations, Party Wall and target start-date information
Consent review may identify missing information, design changes or additional conditions

Support Continues by Organising the Next Approval Requirement Clearly

We can help review requests for revised drawings, structural information, contractor policies, method statements or additional protection measures. The applicant and contractor remain responsible for declarations, fees, workmanship and compliance, while the landlord or freeholder determines the consent.

LEASE

Consent Requirements Reviewed

Lease clauses, parties, fees and required approval steps are checked.

DOCS

Drawings & Supporting Records Organised

Technical, contractor and insurance information is tracked for consistency.

COND

Approval Conditions Coordinated

Access, hours, protection, inspections and deposits are recorded.

CLOSE

Completion Evidence Reviewed

Certificates, photographs, as-built details and reinstatement records are organised.

When the landlord, freeholder or surveyor identifies additional requirements

What Happens if More Details, Insurance or Design Changes Are Needed?

Lease restrictions, structural concerns, common-part interfaces, insufficient insurance, fire or services issues and unclear method statements can change the scope. We explain the request and confirm the cost and programme effect before additional work proceeds.

STOP

Pause the Affected Item

We avoid issuing information known to conflict with the lease or building rules.

SHOW

Record the Requirement

The landlord query, missing document or design concern is set out clearly.

CHECK

Confirm the Correct Specialist Route

Legal, structural, Party Wall, fire or Building Regulations input is separated.

COST

Price Additional Support

Extra drawings, reports, meetings and coordination are shown separately.

TIME

Update the Programme

Landlord review periods, consultant lead times and start-date impact are explained.

RESP

Prepare the Response

Revised information is organised for the next formal consent step.

Building Alteration Approval support cannot control landlord review times, legal negotiations, surveyor comments, contractor acceptance, consent conditions or the final decision. Additional requirements are discussed before being added to scope.

No meaningful fixed figure before the lease, property and alteration are understood

Building Alteration Approval Quotes Reflect the Lease, Technical Package and Required Follow-Up

A simple internal non-structural alteration is not the same as a structural project, wet-area relocation or work affecting common services. We price the actual support scope rather than using one generic consent fee.

Initial Lease & Consent Review
Based on property, lease and proposed workAssessment-Based
Early approval-route review
  • Lease clauses and consent parties reviewed
  • Likely documents and approval steps considered
  • Landlord and professional fees remain separate
Request an Initial Review
Structural or Complex Alteration
Depends on structure, services and building rulesProject Review
Multi-discipline consent coordination
  • Structural and specialist responsibilities reviewed
  • Landlord and consultant requirements coordinated
  • Design development and conditions scoped clearly
Book a Project Review
Conditions or Close-Out Support
Existing consent and outstanding items drive the scopeSupport Plan
Queries, site changes and completion records
  • Consent conditions and outstanding requests reviewed
  • Agreed revised documents or evidence coordinated
  • Corrective construction work remains separate
Send Consent Details
Leaseholders, Landlords, Freeholders, Developers and Property Managers Alteration approval support can be coordinated around design teams, contractors, landlord surveyors, access rules, deposits and target start dates. Pricing is prepared from the lease, property, proposed work and agreed level of support. Request an Alteration Approval Quote
Property factors Type, ownership, lease structure, common parts and building rules.
Technical factors Drawings, structure, services, method statements and contractor information.
Support factors Submission, landlord queries, revisions, conditions and close-out records.
Fees & extras Landlord, legal, surveyor, engineer and statutory approval costs are confirmed separately.
Why one fixed Building Alteration Approval price would be misleading Two flats in the same building can involve different lease clauses, structural work, service changes, contractor risks and landlord requirements. The quotation is confirmed after the lease and proposed alteration are reviewed.

The final quotation is confirmed after reviewing the property, lease, proposed work, available drawings, contractor information and requested support. Additional landlord requirements, reports or revised details are explained and priced before being added.

Building Alteration Approval Support across London

Send Us the Lease, Proposed Work and Available Documents. We Will Help Organise the Next Practical Step.

Include the address, lease clauses, alteration description, drawings, structural information, contractor details and any landlord or managing-agent correspondence.

Why Building Alteration Approvals Matter

Good Alteration Approval Preparation Helps Protect the Property, Project and Leaseholder

Incomplete alteration information can delay landlord consent, increase surveyor queries or create problems once work begins. Careful preparation helps explain the proposal clearly, reduce avoidable revisions and keep the leaseholder, landlord and contractor aligned.

Not every property follows the same alteration approval route. We review the lease, ownership structure, proposed works, structural changes, common parts, building services, contractor details, insurance, method statements and existing landlord correspondence before confirming the support route.

Confirm the consent route before drawings and contractor arrangements are finalised The Lease, Ownership Structure and Proposed Work Shape the Consent Application

Landlord consent, freeholder approval, management-company consent and a formal Licence to Alter can require different documents, fees and review steps.

  • Lease checks help confirm alteration restrictions, demised areas and consent wording.
  • Party checks help identify the landlord, freeholder, managing agent and appointed surveyor.
  • Approval checks help separate landlord consent from planning, Building Regulations and Party Wall matters.
Prepare the alteration package clearly Drawings, Structural Details, Method Statements and Contractor Records Need Accurate Coordination

Existing and proposed drawings, structural calculations, specifications, method statements, contractor details and insurance may all affect landlord review.

  • Drawing checks help keep the scope, affected areas and technical information consistent.
  • Structural checks help coordinate loadbearing changes, openings and engineer information.
  • Contractor checks help organise insurance, competence, programme and site responsibilities.
Coordinate access, protection and building rules, not only the design Working Hours, Deliveries, Common Areas, Fire Safety and Shared Services Need to Agree

A complete alteration application may need access plans, common-area protection, noise and dust controls, fire and services information, delivery arrangements and building-specific method statements.

  • Access checks help plan deliveries, lifts, loading and contractor movement.
  • Protection checks help address floors, walls, lifts, shared areas and neighbouring property.
  • Building-rule checks help confirm working hours, noise controls and shared-system restrictions.
Prepare for consent conditions, site changes and close-out evidence Good Follow-Up Helps Keep Consent, Construction and Close-Out Organised

The landlord, freeholder or surveyor may request revised drawings, extra insurance, further method statements, photographs, inspections or completion evidence.

  • Condition tracking helps keep approval requirements, deposits and deadlines visible.
  • Change coordination helps keep landlord-approved information and site changes consistent.
  • Close-out checks help organise certificates, photographs, as-built information and reinstatement evidence.

The right alteration approval scope depends on the lease, ownership structure, proposed work, technical package, contractor details, landlord requirements, approval conditions and close-out evidence.

Lease Review, Drawings & Alteration Consent Support

Professional Building Alteration Approvals Across London

We support leaseholders, landlords, freeholders and developers with alteration approvals. We review the lease, proposed work, drawings, structural changes, contractor details, insurance and consent requirements.

Consent Route Review

We review landlord consent, freeholder approval and Licence to Alter routes.

Drawings & Structure

Existing and proposed drawings, structural details and affected building areas are coordinated.

Contractor & Site Details

Method statements, insurance, access, working hours and protection measures are reviewed.

Conditions & Close-Out

Approval conditions, landlord queries, site changes and close-out records are coordinated.

Benjamin Services Building Alteration Approvals Guidance

Building Alteration Approval Questions, Answered Clearly

Straight answers about lease restrictions, landlord consent, Licence to Alter, drawings, structural work, contractors, conditions, close-out and quotations.

We review the property, lease and proposed alteration before confirming the support scope

A practical alteration approval application depends on the lease, ownership structure, proposed work, technical documents and landlord requirements.

01 Do I need landlord or freeholder consent before starting alterations?

Many leases require written consent before structural work, layout changes, wet-area alterations, service changes, new flooring or other works begin. The lease and building rules should be reviewed before any contractor starts on site.

02 What is a Licence to Alter?

A Licence to Alter is a formal agreement between the leaseholder and landlord or freeholder setting out the approved work, technical documents, conditions, responsibilities, fees, inspections and completion requirements.

03 Who normally needs to approve the alteration?

Approval may be required from the landlord, freeholder, superior landlord, management company, managing agent or appointed surveyor. The ownership and management structure should be confirmed early.

04 What information is needed for an initial alteration review?

Useful information includes the full address, lease or alteration clauses, property type, proposed work, existing and proposed drawings, structural information, contractor details and any landlord or managing-agent correspondence.

05 What drawings are commonly required?

The application may need existing and proposed floor plans, sections, reflected ceiling plans, service layouts, structural details, wet-area information and drawings showing any work affecting common parts or retained structure.

06 When are structural calculations required?

Structural calculations are commonly needed where loadbearing walls, beams, floors, roof structures, openings or other structural elements are altered. A structural engineer should prepare the relevant calculations and details.

07 What contractor and insurance information may be requested?

Landlords may request contractor company details, public liability insurance, professional indemnity where relevant, references, health and safety information, emergency contacts and evidence of suitable experience.

08 What should a method statement include?

A method statement may explain the sequence of work, tools, access, deliveries, waste removal, noise and dust control, protection of common areas, working hours, temporary works and emergency arrangements.

09 How are common parts and shared services protected?

The application should identify any effect on corridors, lifts, stairs, risers, drainage stacks, communal heating, electrical systems, fire protection or other shared areas. Explicit consent may be needed before these are touched.

10 Is landlord consent the same as planning or Building Regulations approval?

No. Landlord or freeholder consent is separate from planning permission, Building Regulations, Party Wall matters and other statutory approvals. A project may need several approvals before work can lawfully and contractually proceed.

11 What conditions may be attached to an alteration approval?

Conditions may cover working hours, contractor access, deposits, protection measures, inspections, noise controls, insurance, approved materials, reinstatement, certification and the information required at completion.

12 How long does the alteration approval process take?

Timescales depend on the lease, landlord process, surveyor workload, technical complexity, legal drafting, specialist reports and how quickly queries are answered. No support provider can control the final review period or decision.

13 How is the alteration approval support price calculated?

Pricing is based on the property, lease complexity, proposed work, drawing requirements, structural and specialist input, contractor documentation, landlord queries, revisions, conditions and close-out support. Third-party fees are normally separate.

14 What is not automatically included in alteration approval support?

Landlord, freeholder, legal and surveyor fees, structural engineering, Party Wall services, planning, Building Regulations, specialist surveys, construction management, corrective work and any item not listed in the quotation are not automatically included. Consent cannot be guaranteed.

The right alteration approval scope depends on the lease, property, proposed work, technical package, contractor details, conditions and close-out evidence.

Not Sure Which Alteration Consent Route Applies?

Send the property address, lease or alteration clauses, proposed work, drawings, structural information, contractor details and any landlord or managing-agent correspondence.